Planned Projects for Construction of the Transmission Gas Pipelines

No.

Project Name

Project Character

Project Priority

Length

Diameter

Pressure

Capacity

Investment

PTG1.

B. Brod – Doboj – Maglaj – Zenica high-pressure transmission gas pipeline

Middle and low pressure

Priority

project

130 km

16 - 20 inch

50 - 75 bar

1.0 - 2.,0 billion m3

45 - 57 million EURO

PTG2.

Sarajevo – Mostar – Ploce high-pressure transmission gas pipeline

Regional / State project

Middle-term project

175 km

16 - 20 inch

50 - 75 bar

1.,0 – 2.0 billion m3

59 / 73 million EURO

PTG3.

Middle-Bosnian Canton -   Gas pipelines

Entity / State project

Middle-term project

 

Zenica – Travnik

Lašva river region

40 km

16 inch

50 bar

80 million m3

13 million EURO

Travnik – Gornji Vakuf

Vrbas river region

50 km

12,75 inch

50 bar

50 million m3

20 million EURO

Travnik – Jajce

Vrbas river Region

30 km

 16 inch

50 bar

17 million m3

PTG4.

Una-Sana Canton – Gas pipelines

Entity / State project

Middle-term project

 

V. Kladuša – Bihac – B.Krupa

Phase I

80 km

16 inch

50 bar

 

30 million EURO

B.Krupa – B.Petrovac – Kljuc

Phase II

130 km

16 inch

50 bar

43 million EURO

Planned Projects for Gasification of Cantons / Cities

No

Project Name

Project Character

Project Priority

Network

Pressure

Estimated Consumption

Investment

PGG1.

Gasification of the cities along the route of Bosanski Brod – Zenica gas pipeline

Entity project

Middle-term project

Distribution network made of polyethylene pipes

Middle and low pressure

150 million m3

12 million EURO

PGG2.

Gasification of the cities along the route of Sarajevo – Ploce gas pipeline

Entity project

Long-term project

Distribution network made of polyethylene pipes

Middle and low pressure

150 million m3

(Aluminum Factory of  Mostar not included)

17 million EURO

PGG3.

Gasification of the cities in Middle-Bosnian Canton

Entity project

Middle-term project

Distribution network made of polyethylene pipes

Middle and low pressure

150 million m3

12 million EURO

PGG4.

Gasification of the cities in Una – Sana Canton    

Entity project

Middle-term project

Distribution network made of polyethylene pipes

Middle and low pressure

170 million m3

21 million EURO

PGG5.

Gasification of the City of Orašje

Entity project

Middle-term project

Distribution network made of polyethylene pipes

Middle and low pressure

10 million m3 (Orašje)

1,5 million EURO

22 million m3

(Odzak and Šamac)

3 million EURO

Planned Project for Construction of Storage Facility including Gas Pipeline Connection 

No

Project Name

Project Character

Project Priority

Storage Facility Features

Gas Pipeline Features

Investment

Storage Facility

Gas Pipeline Connection

PTGS6.

Underground  Gas Storage Facility in Tetima salt mine incl. Kladanj – Tuzla – Tetima gas pipeline connection

Regional / State project

Long-term project

Number of chambers:

4

Length

55 km

Variant

I*

42 million EURO

19 million EURO

Useful chamber capacity

124 000 m3

Raster of boring:

180 m

Diameter

16 inch

Variant

II**

44 million EURO

Max/Min pressure in chamber:

126 / 25 bar

Chamber diameter:

50 m

Pressure

50 bar

Variant***

35 million EURO

Minimum useful storage capacity:

60 mil.m3

*

Storage facility to be used to balance seasonal consumption and to satisfy peak demand

**

Storage facility to be used in case of damage in gas pipeline or for strategic aims

***

The Project should be realized in phases, what implies investments in two underground chambers; In other words, the Project would be realized as Variant I, but without two production lines for two caverns and without two compressors.