Planned Projects for Construction of the Transmission Gas Pipelines |
||||||||||||||||||||
No. |
Project Name |
Project Character |
Project Priority |
Length |
Diameter |
Pressure |
Capacity |
Investment |
||||||||||||
B. Brod – Doboj – Maglaj – Zenica high-pressure transmission gas pipeline |
Middle and low pressure |
Priority project |
130 km |
16 - 20 inch |
50 - 75 bar |
1.0 - 2.,0 billion m3 |
45 - 57 million EURO |
|||||||||||||
Sarajevo – Mostar – Ploce high-pressure transmission gas pipeline |
Regional / State project |
Middle-term project |
175 km |
16 - 20 inch |
50 - 75 bar |
1.,0 – 2.0 billion m3 |
59 / 73 million EURO |
|||||||||||||
Middle-Bosnian Canton - Gas pipelines |
Entity / State project |
Middle-term project |
|
|||||||||||||||||
Zenica – Travnik |
Lašva river region |
40 km |
16 inch |
50 bar |
80 million m3 |
13 million EURO |
||||||||||||||
Travnik – Gornji Vakuf |
Vrbas river region |
50 km |
12,75 inch |
50 bar |
50 million m3 |
20 million EURO |
||||||||||||||
Travnik – Jajce |
Vrbas river Region |
30 km |
16 inch |
50 bar |
17 million m3 |
|||||||||||||||
Una-Sana Canton – Gas pipelines |
Entity / State project |
Middle-term project |
|
|||||||||||||||||
V. Kladuša – Bihac – B.Krupa |
Phase I |
80 km |
16 inch |
50 bar |
|
30 million EURO |
||||||||||||||
B.Krupa – B.Petrovac – Kljuc |
Phase II |
130 km |
16 inch |
50 bar |
43 million EURO |
|||||||||||||||
Planned Projects for Gasification of Cantons / Cities |
||||||||||||||||||||
No |
Project Name |
Project Character |
Project Priority |
Network |
Pressure |
Estimated Consumption |
Investment |
|||||||||||||
PGG1. |
Gasification of the cities along the route of Bosanski Brod – Zenica gas pipeline |
Entity project |
Middle-term project |
Distribution network made of polyethylene pipes |
Middle and low pressure |
150 million m3 |
12 million EURO |
|||||||||||||
Gasification of the cities along the route of Sarajevo – Ploce gas pipeline |
Entity project |
Long-term project |
Distribution network made of polyethylene pipes |
Middle and low pressure |
150 million m3 (Aluminum Factory of Mostar not included) |
17 million EURO |
||||||||||||||
Gasification of the cities in Middle-Bosnian Canton |
Entity project |
Middle-term project |
Distribution network made of polyethylene pipes |
Middle and low pressure |
150 million m3 |
12 million EURO |
||||||||||||||
Gasification of the cities in Una – Sana Canton |
Entity project |
Middle-term project |
Distribution network made of polyethylene pipes |
Middle and low pressure |
170 million m3 |
21 million EURO |
||||||||||||||
Gasification of the City of Orašje |
Entity project |
Middle-term project |
Distribution network made of polyethylene pipes |
Middle and low pressure |
10 million m3 (Orašje) |
1,5 million EURO |
||||||||||||||
22 million m3 (Odzak and Šamac) |
3 million EURO |
|||||||||||||||||||
Planned Project for Construction of Storage Facility including Gas Pipeline Connection |
||||||||||||||||||||
No |
Project Name |
Project Character |
Project Priority |
Storage Facility Features |
Gas Pipeline Features |
Investment |
||||||||||||||
Storage Facility |
Gas Pipeline Connection |
|||||||||||||||||||
Underground Gas Storage Facility in Tetima salt mine incl. Kladanj – Tuzla – Tetima gas pipeline connection |
Regional / State project |
Long-term project |
Number of chambers: |
4 |
Length |
55 km |
Variant I* |
42 million EURO |
19 million EURO |
|||||||||||
Useful chamber capacity |
124 000 m3 |
|||||||||||||||||||
Raster of boring: |
180 m |
Diameter |
16 inch |
Variant II** |
44 million EURO |
|||||||||||||||
Max/Min pressure in chamber: |
126 / 25 bar |
|||||||||||||||||||
Chamber diameter: |
50 m |
Pressure |
50 bar |
Variant*** |
35 million EURO |
|||||||||||||||
Minimum useful storage capacity: |
60 mil.m3 |
|||||||||||||||||||
* |
Storage facility to be used to balance seasonal consumption and to satisfy peak demand |
|||||||||||||||||||
** |
Storage facility to be used in case of damage in gas pipeline or for strategic aims |
|||||||||||||||||||
*** |
The Project should be realized in phases, what implies investments in two underground chambers; In other words, the Project would be realized as Variant I, but without two production lines for two caverns and without two compressors. |
|||||||||||||||||||